"Our warehouse team had missed dispatch targets for three straight months. Helen spent two days on the floor and identified that our pick-list format was causing rework — something none of us had questioned. The fix was embarrassingly simple once she pointed it out."— Tom W., Warehouse Manager, food distribution, Ipswich
"David coached me through my first formal performance conversation in eight years of management. I had been avoiding it because I did not want to lose the person. The conversation went better than I expected, though it was still uncomfortable — which David had warned me about."— Sandra L., Team Leader, accounting practice, Brisbane CBD
"The diagnostic report was thorough. Some of the findings stung — we had been praising a culture of flexibility that was actually just inconsistency. The 90-day recovery programme helped us rebuild weekly planning habits."— James H., General Manager, landscaping services, Sunshine Coast
"Poplar Path was direct without being harsh. Priya understood our roster constraints in a way generic consultants never had. The only reservation I have is that we should have called them six months earlier."— Mei C., Operations Director, aged care provider, Logan
Client: Mid-size freight operator, 22 staff across dispatch, admin, and driver coordination
Situation: On-time delivery had dropped from 94% to 78% over eight months. Management attributed the decline to “attitude problems” among dispatch staff. Two experienced coordinators had resigned.
Engagement: Team Turnaround Diagnostic followed by a 90-day Performance Recovery Programme
What we found: Dispatch and driver coordinators used different systems to track loads. Handoff meetings had been cancelled to “save time” six months earlier. Managers were resolving the same routing disputes daily instead of establishing rules.
Actions taken:
Outcome after 90 days: On-time delivery returned to 91%. Staff turnover stabilised. The general manager reported spending roughly four fewer hours per week on dispatch disputes.